Day 83 November 14

 Today was another maintenance day.  I started the day by going over to VSR with Tony.  We started by checking out all our make-readies, and then we did a property walk and picked up trash and changed out bags at pet stations.  After that, we had to make the long drive over to one of our new properties, where they had just topped out, and there was lunch for everyone there.  A nice Mexican restaurant was catering, so we had some really good food.  There were around 50 construction workers there who also got fed.  When we were done with lunch, we headed back to VSR. On the way, we stopped at UT to drop off a demand.  When we got to VSR, we tackled changing the filters for the heating and AC.  I spent most of my time cutting out the filters, but when I was done joined Tony in installing them.  When we were done with filters, I got to work on a make-ready.  I started by taking all the brackets and tacks off the walls that the cleaners missed.  Then I caulked a lot of holes in the walls.  After that, I sprayed Kils on all the spots on the walls so I could touch them up.  I ran out of kills, so then Tony had to go get more, which took enough time that we had to call it a day.  When I got home, I packed for camp and then ate some supper.  When everyone was ready, we drove up to camp and got settled into our rooms.  We are staying in the Pleaties.  Once we were settled in, we went down to the lodge and played some games for a while before heading to bed.

Comments

Popular posts from this blog

Day 28

Day 32

Day 26