Day 174 March 6

 Today we started with insulation.  I was designated to cut the pieces that were needed, so I ended up very itchy.  When we were done insulating, the drywall showed up, and we unloaded it.  After we took our lunch break, we spent the rest of the afternoon hanging all the drywall for the house.  To finish up, we cleaned up the jobsite more than we had the previous days.  Then we headed back to base, and I took my first hot shower all week.  Then we had some time to relax, and then supper.  After supper, we played some games and visited, and then went to bed.  